Tag: licencia de obras

  • Buying Off-Plan Property in Spain: UK and US Guide

    Buying Off-Plan Property in Spain: UK and US Guide

    A Spanish developer can sell you a flat that currently exists as drawings, a crane and a very confident brochure. That is the appeal of buying off-plan, and it is also the risk. I am a Mancunian who settled in Marbella over ten years ago, and the question I would put first for every buyer is simple: what protects your money until the keys are in your hand? This guide follows the order in which you will meet things, from first checks to handover.

    Buying off-plan property in Spain means committing to a home before construction is complete. UK and US buyers should independently verify the developer, land title, building licence, contract and advance-payment protection before transferring money. Budget for purchase taxes, staged payments and financing risks; ownership does not itself grant Spanish residency.

    Is Buying Off-Plan Property in Spain Right for You?

    Buying off-plan property in Spain suits buyers who can accept delivery risk, fund staged payments and check paperwork before they fall for a show flat. The Spanish phrase is sobre plano, meaning you contract to buy a home from the plans before it is finished.

    Three situations hide under that one label. An off-plan purchase usually means works have not started or have only just begun. An under-construction purchase means the building is visibly rising, so you can inspect the site but not your finished home. A completed new-build is physically finished, so you can inspect the actual flat even if some occupation paperwork is still being processed.

    Off-plan versus completed new-build and resale

    General characteristics of three ways to buy a home in Spain (As of November 2026; no price advantage is implied)
    FactorOff-planCompleted new-buildResale
    AvailabilityWidest choice of units and floors; early buyers choose firstOnly the units left unsoldWhatever is currently on the market
    InspectionPlans, show flat and site visit; the finished home cannot be checkedThe actual home can be inspected before completionThe actual home can be inspected, including wear and past repairs
    CustomisationOnly the choices the contract allows, confirmed in writingUsually noneDone after purchase, at your cost
    Cash commitmentStaged payments during construction, then the balance at completionMost of the price at or soon after signingA deposit, then most of the price at completion
    UncertaintyDelivery date, final specification, developer solvency, valuation at completionLower delivery risk; occupation paperwork still to confirmTitle, debts, condition and past works

    I have left out discounts and price growth on purpose, because neither is standard. The price of an off-plan home depends on the developer, the location and the market on the day you sign, and no figure can be promised in advance.

    Here’s where people usually come unstuck: they compare brochure prices rather than the cash they must find and the dates they must find it. A resale home asks for most of its cost on completion day. An off-plan home asks for money in stages, long before you can sleep in it.

    A property adviser and buyers viewing an off-plan residential development on the Costa del Sol

    UK and US Buyers: Ownership, NIE and Residency

    Foreign individuals can generally buy residential property in Spain, and owning it does not give you the right to live there. Ask your lawyer to confirm that the address is not in an area with special restrictions on foreign ownership, such as certain military or border zones.

    Five questions get tangled here, so I keep them apart. Nationality decides which passport rules apply to you. Residence is where you actually live. Tax residence is a separate test, which in Spain generally turns on spending more than 183 days in a calendar year or having your main economic interests there. Mortgage eligibility depends on the lender’s underwriting. Immigration status decides how long you may stay.

    Buyer preparation compared for British and American buyers (As of November 2026; your lawyer and notary set the final document list)
    ItemUK buyerUS buyer
    IdentityValid passport and proof of addressValid passport and proof of address
    NIE (número de identidad de extranjero)Needed for the purchase and tax filings; obtainable through a consulate, in Spain, or via your lawyer under power of attorneySame requirement and routes
    Source of fundsFor example, UK bank statements, a property sale statement or pension evidenceFor example, US bank or brokerage statements or a sale closing statement
    Mortgage documentsIncome, credit and tax records as the lender requestsPay records and tax returns as the lender requests; credit history may not transfer
    Translation and apostilleForeign documents often need an apostille and sworn translationSame; apostille issuer depends on the document
    Power of attorneySigned before a Spanish notary, or abroad with apostille and translation; limit its scopeSame
    Tax adviceCross-border adviser for UK and Spanish treatmentCross-border adviser to confirm whether any US reporting applies to you

    As of November 2026, ordinary British and American visitors who need no visa for short stays are generally limited to 90 days in any 180-day period across the whole Schengen area, not 90 days per country. My advice to every British buyer is to plan as a non-EU visitor, because since Brexit that is what you are. Buying a home does not extend the limit. The UK government’s Spain entry requirements page sets out the current rules for British travellers, and American citizens can check the US State Department travel site for their side.

    New applications for Spain’s property-based investor visa ended on 3 April 2025, and existing cases follow transitional arrangements, so a specialist immigration lawyer should check any earlier application or renewal. A Spanish purchase does not by itself decide whether a US reporting form applies to you, so ask a cross-border tax adviser rather than assuming. The IRS website is the place to read the US side of the rules.

    Before Reserving: Check the Developer and Land

    Before you pay a reservation, collect ten documents and decide, for each, whether it lets you proceed or tells you to pause. Always ask for the nota simple before you commit; it is the Registro de la Propiedad’s summary of who owns the land, what it is and what is registered against it.

    1. Independent lawyer (abogado). Document: an engagement letter from a lawyer who acts only for you. Pause if the developer or agent insists you use theirs.
    2. Seller and signing authority. Document: company details and proof the signatory may bind the seller. Pause if the contracting company differs from the one in the brochure.
    3. Current land title. Document: a recent nota simple from the Registro de la Propiedad. Pause if the seller does not own the plot.
    4. Charges and developer finance. Document: the registered mortgage details and the lender’s written process for releasing your unit. Pause if no release process exists.
    5. Granted building licence (licencia de obras). Document: the licence decision for this phase and unit. An application is not a grant, and a nota simple does not prove planning legality. Pause if you see only a pending application.
    6. Approved plans. Document: plans matching your unit number, floor and orientation. Pause if they do not match the brochure.
    7. Residential use. Document: the licence or a town hall certificate confirming the use. Pause if use is unclear.
    8. Specification. Document: the signed memoria de calidades listing materials and fittings. Pause if it is only a glossy summary.
    9. Account recipient. Document: the account named in the contract and guarantee. Pause if the holder is not the seller.
    10. Reservation refund terms. Document: the reservation form. Pause if refund conditions, credit against the price and expiry are vague.

    Keep dated copies of every brochure, price list and advert, because they show what was promised. Check whether areas are superficie útil (useful floor area) or superficie construida (built area, which includes walls and a share of common space), and how terraces, parking and shared facilities are counted.

    A buyer and lawyer reviewing architectural plans for a Spanish apartment

    Bank Guarantees and Advance-Payment Protection

    As of November 2026, the first additional provision of the Ley 38/1999 de Ordenación de la Edificación (LOE) requires a developer who takes advance payments for homes still to be built to guarantee that money from the moment the building licence is obtained. The guarantee is an aval bancario (bank guarantee) or a seguro de caución (surety insurance), and the advances must go into a cuenta especial, an account kept apart from the developer’s other money. It covers qualifying advances, applicable taxes and statutory interest if the home is not delivered as agreed, subject to its wording.

    Here’s where people usually come unstuck. The protection starts at the licence stage, so money paid before a licence is granted, often a reservation, sits outside this mechanism and depends on the contract. The cuenta especial is a segregated account for the development, not an escrow you control, and an ordinary developer account does not meet the requirement. An agent saying ‘it’s all guaranteed’ is reassurance, not evidence.

    What your guarantee must identify

    • Your name and ID, matching the contract.
    • The specific home, plus any parking space or storage room.
    • The contract date, the advances covered and the tax included.
    • The guarantor, bank or insurer, and the guarantee or policy number.
    • The cuenta especial that must receive your payments.

    An individualised guarantee is issued for you and your unit, not a general certificate covering the whole development.

    What to check before transferring money

    • Your lawyer has seen the granted building licence and its date.
    • You hold the guarantee evidence for this payment and for earlier ones.
    • The account in the transfer instruction matches the contract and guarantee and belongs to the seller.
    • Any change of bank details is confirmed by phone, using a number you found independently, never one in the email announcing the change.
    • The transfer reference names your unit, and you keep the receipt.

    Advance-payment protection is not defects insurance. The guarantee concerns repayment of your advances, while physical defects after completion fall under separate rules, covered below. No guarantee promises recovery either: repayment depends on its wording, the claim conditions and the guarantor’s procedure.

    Off-Plan Contracts and Payment Milestones

    A typical off-plan purchase moves through four stages: reservation, private purchase contract, construction instalments and completion before a notary. At completion you sign the escritura pública de compraventa, the public deed of sale, and pay the balance. The Consejo General del Notariado publishes general guidance on the notarial side of buying a home. No nationwide deposit percentage or payment schedule applies to every project, and I would not assume that a reservation or arras contract lets you walk away for twice the deposit; that depends on the exact wording.

    Contract review table (As of November 2026; drafting varies between developments, so your lawyer must read the actual contract)
    ClauseEvidence to requestRisk if missing
    Price and taxPrice stated with and without VAT, plus the payment scheduleHidden tax shifts your budget
    Delivery dateA fixed date, not ‘approximately’Delay is hard to prove
    ExtensionsDefined reasons and a maximum lengthOpen-ended delay
    Plans and specificationAnnexed plans and signed memoria de calidadesYou cannot show what was promised
    Permitted changesWritten limits on substitutionsCheaper materials without notice
    Area variationStated tolerance and price adjustmentPaying for space you do not receive
    Common facilitiesCompletion commitment for pool, gardens and accessHandover without promised amenities
    Finance conditionsAny mortgage condition and its deadlineObligation to complete without funding
    AssignmentRules on reselling your contractYou cannot exit before completion
    CancellationRefund terms for each stageUnclear loss if you withdraw
    Release of chargesDeveloper’s duty to release the mortgage on your unitTitle delivered with debt attached

    Taxes, Mortgages and Your Cash-Flow Budget

    As of November 2026, the first delivery of an ordinary qualifying dwelling on the Spanish mainland or in the Balearics generally carries 10% IVA, the Spanish VAT, plus regional AJD on the purchase deed. AJD (Actos Jurídicos Documentados, stamp duty on documents) is set by each region. Exceptions exist for some protected housing, non-residential units and special cases, so your lawyer must confirm the treatment for your unit, along with notary, registry and legal fees. The Agencia Tributaria publishes the national guidance on IVA for new homes.

    Taxable advances generally carry IVA when you pay them, so the tax is not all deferred until completion. Purchase-deed AJD is also a different charge from AJD on a mortgage deed, which generally falls on the lender for residential mortgages; ask your lawyer to confirm.

    A hypothetical €400,000 cash-flow example

    The figures below are purely illustrative and are not market data. The reservation is credited within the first instalment, not added on top.

    Hypothetical €400,000 mainland dwelling, instalments exclusive of VAT (As of November 2026; before AJD and fees)
    StageSharePrice excl. VAT10% VATPayment due
    Private contract10%€40,000€4,000€44,000
    During construction20%€80,000€8,000€88,000
    Completion70%€280,000€28,000€308,000
    Total100%€400,000€40,000€440,000

    Financing stress test

    A conventional purchase mortgage generally funds at completion, subject to lender terms, so the first €132,000 (€44,000 plus €88,000) needs separate funding. Now assume a hypothetical loan capped at 60% of the lower of price and valuation. On a €375,000 valuation the loan is €225,000; on a €400,000 valuation it is €240,000. The buyer therefore needs an extra €15,000. This is a model assumption, not a loan offer or a universal loan-to-value limit. The Banco de España publishes customer guidance on mortgages and advance payments.

    Currency and holding costs

    If you pay from pounds or dollars, each instalment is converted at its own exchange rate, so the later payments can cost more or less in your currency than the first. I make no forecast and recommend no product; a regulated adviser can explain the options. Budget also for community fees, annual property tax, insurance and utilities once you hold the keys.

    Regional Checks: Mainland, Mallorca and Tenerife

    Spain is not one tax and licensing jurisdiction, so AJD, occupation documents and letting permission all need address-specific checks. Use the table as a prompt for questions, not as a ranking of destinations.

    Regional questions to ask before reserving (As of November 2026; no regional AJD rates are quoted, so confirm them with the regional tax authority)
    AreaPurchase tax checkOccupation checkLetting check
    Barcelona and CataloniaCatalan regional tax authority confirms AJDTown hall confirms the occupation or habitability documentMunicipal planning and regional tourism rules
    MadridMadrid regional tax office confirms AJDTown hall confirms the first-occupation routeMunicipal rules and community statutes
    Valencia and AlicanteValencian regional tax authority confirms AJDTown hall confirms the occupation documentRegional registration, municipal planning and community statutes
    Málaga and MarbellaAndalusian regional tax agency confirms AJDTown hall confirms the occupation documentRegional tourism register, municipal rules and community statutes
    Mallorca and BalearicsBalearic regional tax service confirms AJDTown hall confirms the occupation or habitability documentIsland and municipal tourist-letting limits
    Tenerife and CanariesCanary tax authority confirms IGIC treatmentTown hall confirms the occupation documentRegional holiday-letting rules and municipal planning

    Tenerife uses IGIC (Impuesto General Indirecto Canario), the Canary Islands’ indirect tax, rather than mainland IVA. The general IGIC rate is 7%, but that figure alone does not establish the tax on a particular dwelling purchase. Buying for holiday letting needs its own licensing and community check, because rental permission is never automatic.

    If Construction Is Delayed or the Developer Fails

    A delayed delivery and a failed developer are different problems, and both are handled by following evidence rather than instinct. This sequence is general, and your lawyer will adapt it to your contract and the applicable regime.

    1. Preserve the evidence. Keep the reservation form, contract, annexes, receipts, guarantee documents, dated brochures, messages and site photographs.
    2. Establish the breach. Identify the contractual delivery date, any valid extension the contract allows, and whether the delay is a real breach.
    3. Take advice before you stop paying. Withholding an instalment on your own can put you in breach.
    4. Compare your options. You may agree a documented extension, with a new date and written confirmation that the guarantee remains valid, or you may seek termination and repayment.
    5. Send a formal demand where appropriate. Your lawyer will choose a method that creates proof of delivery.
    6. Follow the guarantor’s procedure. Identify the bank or insurer, supply the documents it requires and keep every reply.

    Developer insolvency does not by itself cancel a valid guarantee, but its enforceability depends on its wording, the conditions met and the guarantor’s process. I give no universal deadline for claims, because time limits depend on the instrument and the regime, and your lawyer must verify them early. Nobody can promise an immediate refund, and not every consequential cost, such as rent paid elsewhere or currency losses, is covered.

    Handover, Occupation Documents and Building Defects

    Construction reception and your handover are two separate events. The acta de recepción is signed between the developer and the contractor under the LOE, while your handover is the moment you receive the home after completing the purchase.

    • Occupation document. Obtain the licencia de primera ocupación or the valid regional equivalent, confirmed by the town hall.
    • Completion documents. Ask for the certificate of completed works and the building documentation.
    • Title and unit identification. The deed and registry entry must describe your actual unit, parking space and storage room.
    • Finance charges. Confirm that developer mortgage debt on your unit is released or cancelled.
    • Independent snagging. Hire your own inspector, who is not employed by the developer.
    • Utilities and energy certificate. Check the water and electricity connections, and obtain the energy certificate.
    • Keys, manuals and community. Collect all keys and appliance manuals, and learn the community fees and rules.

    Remote buyers can complete through a properly reviewed power of attorney, with an independent inspector reporting on the home in writing and with photographs. Your lawyer should limit what the attorney may sign. Do not hold back completion funds or refuse to complete on your own initiative; take legal advice first.

    As of November 2026, the LOE sets liability periods of one year for finishing defects, three years for habitability defects and ten years for qualifying structural damage. They run from statutory reception without reservations, or from the correction of those reservations where relevant. These are not universal deadlines for filing claims, and they are not three automatic insurance policies, so ask your lawyer which cover exists for your development.

    A building inspector checking a terrace door in a newly completed apartment

    Your Off-Plan Purchase Decision Checklist

    Proceed only when the documents, protection and cash flow all hold up; pause when any one is missing.

    • Proceed when your lawyer has verified the seller, land title and granted licence.
    • Proceed when every advance is protected by an individualised guarantee and paid to the verified account.
    • Proceed when you can afford the staged payments and have a credible plan to fund completion.
    • Proceed when delivery, extension and cancellation terms are acceptable in writing.
    • Pause when a payment is requested before the licence or guarantee evidence arrives.
    • Pause when the account differs from the contract, or someone pressures you to pay quickly.

    If you would like a development comparison and a pre-reservation document checklist, send us your preferred location, budget, intended use and financing needs through the contact options on this site. Development selection support and independent legal review do different jobs, so keep your own Spanish lawyer in the process.

    This guide is general information, not legal, tax or mortgage advice. Take independent advice from a Spanish lawyer, a tax adviser and a mortgage specialist before you commit.

    Buying Off-Plan Property in Spain: FAQs

    Is buying off-plan property in Spain safe?

    Buying off-plan in Spain carries construction, developer and financing risks, and legal protections reduce some of them without replacing independent checks. Before paying, have your lawyer verify the land title, the granted building licence, the contract, the payment account and your individualised guarantee. Protection of advance payments is separate from liability for building defects after completion, which follows different rules.

    Can British and American buyers get an off-plan mortgage in Spain?

    British and American applicants may obtain Spanish mortgage finance, subject to the lender’s eligibility rules, income assessment and property valuation. A conventional purchase mortgage generally funds at completion rather than paying early construction instalments, so arrange separate funding for advances and taxes. An initial indication is not an unconditional future loan, and lenders reassess your finances and the valuation before completion.

    How much deposit do you pay for an off-plan property in Spain?

    Spain has no single statutory deposit percentage for every off-plan purchase. The reservation document and the private contract set the amounts and payment dates. Check whether the reservation is credited against later instalments, whether tax is included, when refunds apply and how each advance is protected. A developer’s advertised schedule describes that project, not a national rule.

    What happens if the developer misses the completion date?

    A missed completion date calls for a review of the contract, any valid extension and the applicable law. Depending on the facts, you may agree a documented extension or seek termination and repayment. Keep payment evidence and take advice promptly about formal demands and guarantee enforcement. Do not assume that stopping instalments is permitted, or that an immediate refund will follow.

    What taxes apply when buying a new-build home in Spain?

    As of November 2026, an ordinary qualifying new-home purchase on mainland Spain or in the Balearics generally attracts 10% IVA plus regional AJD on the purchase deed. Exceptions and reduced rates need individual checks, and taxable advances generally carry IVA when received. Tenerife follows the Canary Islands’ IGIC system, so mainland VAT assumptions should not be used there.

    Does buying an off-plan home give UK or US citizens Spanish residency?

    Buying an off-plan home does not itself grant Spanish residency. As of November 2026, ordinary visa-free British and American visitors remain subject to the 90-days-in-180 Schengen limit unless another status applies. New investor-visa applications ended on 3 April 2025, and existing cases follow transitional rules. Living in Spain longer requires a separate qualifying immigration route.

    What to Take Away Before You Reserve

    Let me put it plainly: an off-plan purchase is safe only to the extent that you have verified it. Check the developer and land, confirm the granted licence, hold an individualised guarantee and pay only into the account the guarantee names. Read the contract for delivery, extension and cancellation terms before any money moves.

    Then stress-test the budget. Staged payments, VAT on advances, a lower valuation and exchange-rate movements can each widen the gap before completion, and a mortgage usually arrives only at the end. Ten years on the Costa del Sol have taught me that the paperwork is rarely the problem; skipping it is.

    Source note: this guide draws on the framework published by the Boletín Oficial del Estado (the LOE and its first additional provision), the Banco de España‘s customer guidance on advance payments, the Agencia Tributaria‘s guidance on new-home taxation, the Canary Islands tax authority for IGIC, and Spanish consular and Ministry of Foreign Affairs entry and visa guidance. Rules and rates change, so ask your lawyer to confirm the current text.